Before you sign with a software company: ten questions you should get answered in writing
A polished demo does not tell you everything. These questions reveal what you will actually get, what you will pay for later, and what happens to your data if you leave. We ask them of ourselves before clients do.
Most software project disputes do not come from bad faith but from assumptions nobody wrote down: the client thought something was “included”, the developer thought it was “extra”. These questions turn assumptions into lines in the contract.
About the demo
- Is what I am seeing a working system or a static design? Is the data in it real or synthetic?
- Which part of what I saw exists today, and which part will be built for my project?
About scope and price
- What is the full list of what the price covers, and what is not covered?
- How is a change request priced once the scope is signed?
- What are the recurring costs after launch: hosting, support, third-party fees?
About ownership and data
- Who owns the code? Who owns the data? Are there licences for open-source components inside the system?
- How do I export all my data if I move to another provider, and within how many days?
About life after launch
- Who fixes bugs, within how many hours, and during which hours?
- How are backups taken, and has restoring one actually been tested?
- Who do I talk to when something breaks: an engineer who knows the system, or general support staff?
How to read the answers
A good answer is specific and written down, even when it is not the answer you hoped for. Be wary of absolute promises: “round-the-clock support” from a small team, a “savings percentage” with no basis, or “production-ready” for something you have not tried yourself.
How we answer them
Every product card on our site states its real status — available with a demo, guided demo, or a concept not yet built — and the data in our demos is labelled synthetic. Ownership, support and hosting questions are answered on our FAQ page, and in detail in the contract.